Site start
The erection of 1 no. Temporary Accommodation Modular building
Dunmore, Galway
1 commencement notice · start date 30 Dec 2022 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 30 Dec 2022
- Latest notice
- 104 m²
- Planning references
- None given
- Location
- Dunmore, Galway
Location
Where the site is
- Area
- Dunmore, Galway
- County
- Galway
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The erection of 1 no. Temporary Accommodation Modular building comprising of a 100m2 SEN base, connections to existing site services and all associated site development works to complete the development.
Floor area stated for this source: 104 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.