1 commencement notice · start date 23 Jul 2026 · planning reference given
Planning WEB5840/25 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 23 Jul 2026
- Latest notice
- 1 house
- Planning reference
- WEB5840/25
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
Addresses on the notices
- ground floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The demolition of an existing two-storey, four-bedroom, pitched roof, detached dwelling; (ii) construction of a new three-storey, four-bedroom, pitched roof, detached replacement dwelling; (iii) provision of an attached single-storey, single-bay flat/green roof garage at ground floor level; (iv) provision of storage at attic level; (v) provision of 2 no. terraces to the east (comprising 1 no. at first floor level with access to external stairs and 1 no. at second floor level); (vi) provision of an internal lift for accessibility; and (vii) all ancillary works including site clearance, hard and soft landscaping, boundary treatments, and SuDS measures, as necessary to facilitate the development. Vehicular and pedestrian access will be via the existing site entrance at Sydney Parade Avenue.
Floor area stated for this source: 599 m².