Site start
Site start — Naas
Naas, Kildare
3 commencement notices · latest start date 08 May 2018 · planning reference given
Planning 13/500052 · Council file · external
- Commencement notices
- 3
- Latest start date
- 08 May 2018
- Latest notice
- 14 m²
- Planning reference
- 13/500052
- Location
- Naas, Kildare
Location
Where the site is
- Area
- Naas, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the construction of a free standing external store ancillary to the new build Mercy Convent NS Naas commencement notice submission No 8400899
Floor area stated for this source: 14 m².
The Development will consist of the demolition of the existing two/one storey school built in 1974, the removal of all existing temporary buildings on the site, the construction of a temporary construction access road leading from the Canal Bank Road to the west across the playing fields of the neighbouring St. Mary’s College post primary school, the erection of a temporary 2 storey 22 classroom primary school on the primary school playing pitch and the erection of a new 3 storey 32 classroom primary school with ancillary accommodation, 50 car park spaces, 3 ball courts, 2 no. junior play areas, the construction of a raised footpath leading from Sallins Road through the Church carpark to the school and associated landscaping. The work also includes the reinstallation of a boiler and external lightweight flue to the School Building constructed in 1900 which is a protected structure, RPS reference 19:201.
The development consists of demolition of the existing two/one storey school built in 1974, the removal of all existing temporary buildings on the site, the construction of a temporary construction access road leading from the Canal Bank to the west across the playing fields of the neighbouring St. Mary’s College post primary school, the erection of a temporary 2 storey 22 classroom primary school in the grounds of the post primary school and the erection of the new 3 storey 32 classroom primary school with ancillary accommodation, 50 car park spaces, 3 ball courts, 2 no. junior play areas and associated landscaping. The work also includes the reinstallation of a boiler and external flue to the School Building constructed in 1900 which is a protected structure RPS reference 19:201. This commencement notice applies to the temporary school for which there are separate Fire and Disability Access Certificates. A separate commencement notice will be lodged in due course for the permanent school.
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.