Site start

Housing site start — Dún Laoghaire

Dún Laoghaire, Dublin

1 commencement notice · start date 21 Oct 2016 · planning reference given

Planning D15A/0559 · Planning application

View full project timeline

Commencement notices
1
Latest start date
21 Oct 2016
Latest notice
120 m²
Planning reference
D15A/0559
Location
Dún Laoghaire, Dublin

Location

Where the site is

Area
Dún Laoghaire, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Demolition of an existing commercial building and construction of a part two-storey, two bedroom mews house measuring 112m2 with external courtyard and 8m2 enclosed shed.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 120 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Planning reference D15A/0559

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.