Building extension commencement notices — Kimmage

Kimmage, Dublin

1 unique commencement event · latest notified commencement 27 Apr 2026 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
27 Apr 2026
Latest notice
144 m²
Planning references supplied
SD25B/0463W
Public location
Kimmage, Dublin

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
2
Exact completion events
0

Planning SD25B/0463W — GRANT PERMISSION · Decision 2025-10-31 · Final grant 2025-12-10

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Kimmage, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD25B/0463W. South Dublin County Council Official link · last checked 01 Aug 2026 Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Removal of the existing single storey extensions on the side (18sq.M); Removal of the existing single storey porch to the front (5sq.M); Alterations to the front roof to include the provision of 3 no. x dormer windows at first floor level in lieu of existing shed dormer, the provision of an open veranda at ground floor and adjustment of window opes to the front elevation; Construction of part two storey extension on the side (12 sq.M); Construction of a single storey extension to the rear (26 sq.M ); Alterations and addition (7 sq.M) to the rear roof at first floor level; Relocation of the piers and gate of the existing vehicular entrance to the front driveway with associated landscaping and all ancillary works necessary to facilitate the development.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 144 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.