Commencement notice group
Building extension commencement notices — Dublin
Dublin 2, Dublin
1 separate notice · latest notified commencement 01 Jun 2026 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 01 Jun 2026
- Latest notice
- 378 m²
- Planning references supplied
- WEB5021/25
- Public location
- Dublin 2, Dublin
Public source geography
Site location
- Public site / locality
- Dublin 2, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
the removal of a brick garden wall to the rear, construction of a single storey extension to the rear, construction of a single storey shed to the rear, remodelling of the stairs and landing between basement level and entrance level, breaking out of an ope to rear lower landing level to make connection to extension, modification of ope to side of lower landing level to make connection to extension, installation of ensuite bathroom at second floor level, refurbishment of sliding sash windows, installation of solar panels to rear aspect of roofs, and other minor modifications as shown on application drawings and landscaping works
378 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.