Site start

Building extension site start — Blackrock

Blackrock, Dublin

1 commencement notice · start date 04 Jun 2026 · planning reference given

Planning D26B/0103/WEB · Planning application

View full project timeline

Commencement notices
1
Latest start date
04 Jun 2026
Latest notice
1 unit
Planning reference
D26B/0103/WEB
Location
Blackrock, Dublin

Location

Where the site is

Area
Blackrock, Dublin
County
Dublin

Addresses on the notices

  • the first floor to the front to suit the above roof alterations
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

? ? Alteration to the front wall and roof form to create a gabled elevation to the existing first floor projection to the front; Raising of the window at the first floor to the front to suit the above roof alterations; All associated internal alterations, drainage and ancillary works.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference D26B/0103/WEB

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.