Commencement notice group
Building B at Grange Castle South Business Centre — commencement notices
Lucan, Dublin
7 unique commencement events · latest notified commencement 20 Sep 2024 · planning reference supplied
- Unique commencement events
- 7
- Latest notified commencement
- 20 Sep 2024
- Latest notice
- 250 m²
- Planning references supplied
- SD20A/0121
- Public location
- Lucan, Dublin
Public source geography
Site location
- Public site / locality
- Lucan, Dublin
- County
- Dublin
Public site labels seen across the notices
- Dublin 22, Dublin
- Dublin, Dublin
- Building C Data Centre DUB089 at New Nangor Road, Lucan, South Dublin
- Nangor Road, Lucan, South Dublin
- Grange Castle South Business Centre
- Grange Castle South Business Park, Baldonnell, Dublin 22
- 2 additional public site labels
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD20A/0121. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a Medium Voltage (MV) switchgear facility that serves the data centre known as Building C.The MV building is a single storey building consisting of three rooms accessed from four external doors. Each room will house electrical switchgear for operational purposes of the aforementioned data centre at Building C Data Centre DUB089 at New Nangor Road, Lucan, South Dublin.
Floor area stated for this source: 250 m².
Construction of a new two storey data centre building to be located in Grange Castle Business Park. the construction will be formed with the use of a structural steel frame with in situ reinforced concrete at Nangor Road, Lucan, South Dublin.
Floor area stated for this source: 28,573 m².
Construction of an MV Building to serve the data centre known as Building B at Grange Castle South Business Centre. The building is a single-storey constructed to the north of the data centre with masonry blockwork to house medium voltage switchgear. The substation will feature two rooms for housing the equipment at Baldonnell Rd., Lucan, South Dublin.
Floor area stated for this source: 251 m².
Construction of a new two story data centre building at Grange Castle South Business Park, Baldonnell, Dublin 22
Floor area stated for this source: 21,725 m².
The building is a single story security hut to be located at the entrance to the site. Contains a security office space and a server room at Old Nangor Rd, Kilmahuddrick, Dublin 22
Floor area stated for this source: 31 m².
The building is a single storey building constructed to house medium voltage electrical plant for an adjacent data centre at Old Nangor Rd, Kilmahuddrick, Dublin 22.
Floor area stated for this source: 245 m².
Construction of a new two storey data centre building at Grange Castle South Business Park, Baldonnell, Dublin 22.
Floor area stated for this source: 28,573 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.