Commencement notice group
Housing commencement notices — Kimmage
Kimmage, Dublin
1 separate notice · latest notified commencement 17 Oct 2018 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 17 Oct 2018
- Latest notice
- 9 homes
- Planning references supplied
- 2543/18
- Public location
- Kimmage, Dublin
Public source geography
Site location
- Public site / locality
- Kimmage, Dublin
- County
- Dublin
Public site labels seen across the notices
- Aideen Place
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
demolition of the existing light industrial/commerci al units and construction of 9 no. contemporary part- two part-three storey with flat roof and single storey rear element, three- bedroom, mews dwellings; each with 1 no. internalised parking space accessed from existing front laneway at Aideen Place; private amenity space (rear gardens ranging in size from 53 to 62sq.m and an internal courtyard at ground floor level; boundary treatment, landscaping and all ancillary works necessary to facilitate development.
9 homes · 1,071 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.