Commencement notice group

Housing commencement notices — Monasterevin

Monasterevin, Kildare

1 unique commencement event · latest notified commencement 28 Oct 2025 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
28 Oct 2025
Latest notice
1 house
Planning references supplied
2560095
Public location
Monasterevin, Kildare

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Monasterevin, Kildare
County
Kildare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 2560095. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0135052KE BCMS open-data feed

(a) new single storey extension at rear of existing dwelling including replacement of existing lean-to style roof over existing kitchen with a new flat roof, (b) energy upgrade of existing dwelling to include external insulation with new window and door arrangements at side / rear elevations, (c) demolition of existing detached domestic shed located to the side of existing dwelling, (d) decommissioning of existing sewage treatment system and replacement of same with a new domestic on-site wastewater treatment system, (e) landscaping, connection to existing site services and all associated development works

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 23 m².

Planning reference 2560095

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.