Commencement notice group
Housing commencement notices — Dublin
Dublin, Dublin
1 unique commencement event · latest notified commencement 01 May 2026 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 01 May 2026
- Latest notice
- 1 unit
- Planning references supplied
- None stated
- Public location
- Dublin, Dublin
Public source geography
Site location
- Public site / locality
- Dublin, Dublin
- County
- Dublin
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The development will consist of (a) change of use from office to residential, comprising 1 No. two-bed dwelling house (b) alterations to front elevation and addition of new two-storey extension to front of existing building (c) addition of new second floor setback roof extension (d) setback screened terraces to front and rear of roof with planting areas for privacy (e) internal alterations including addition of homelift to give independent access to all floors (f) existing vehicular and pedestrian access from Heytesbury Lane with 2 No. car parking spaces (g) all associated site works (h) all ancillary works necessary to facilitate the development.
Floor area stated for this source: 250 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.