Commencement notice group

Housing commencement notices — Claregalway

Claregalway, Galway

2 separate notices · latest notified commencement 30 Sep 2025 · planning reference supplied

Source notices
2
Latest notified commencement
30 Sep 2025
Latest notice
60 m²
Planning references supplied
2461489
Public location
Claregalway, Galway

Public source geography

Site location

Public site / locality
Claregalway, Galway
County
Galway

Public site labels seen across the notices

  • Tuam, Galway
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference2461489

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0133842GC BCMS owner-supplied export

construction of domestic garage and all associated works

60 m² · stated on this notice

Planning reference 2461489
CN0133841GC BCMS owner-supplied export

Construction of a detached dwelling house and all associated works

1 home · 235 m² · stated on this notice

Planning reference 2461489

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.