Commencement notice group

Housing commencement notices — Croom

Croom, Limerick

1 unique commencement event · latest notified commencement 29 Mar 2021 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
29 Mar 2021
Latest notice
4 units
Planning references supplied
18/535
Public location
Croom, Limerick

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Croom, Limerick
County
Limerick

Notice location variants

  • the Former AIB Building, High Street, Croom, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Limerick City and County Council planning record Application details, status and decision record for 18/535. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

change of use of the ground floor banking hall into a health/medical services suite to include the demolition of the rear porch area and the provision of a ground floor apartment, conservation of the residential area on the upper floors of the building into 3 no. apartments to include the construction of an extension on the second floor, provision of a demountable ramp to the front door and all ancillary site works, the building is a protected structure at the Former AIB Building, High Street, Croom, Co. Limerick.

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 359 m².

Planning reference 18/535

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.