Site start
Housing site start — Allenwood
Allenwood, Naas, Kildare
1 commencement notice · start date 28 Feb 2024 · planning reference given
Planning 18976 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 28 Feb 2024
- Latest notice
- 142 m²
- Planning reference
- 18976
- Location
- Allenwood, Naas, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 18976 Kildare County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Allenwood, Naas, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 18976. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 1 no. (one bedroom) apartment on ground floor with own front door entrance on front (east ) elevation and rear open space to serve the apartment, B ) 1 no. (two bedroom) apartment on first floor with own door entrance at ground floor level on side (north) elevation with first floor balcony on the rear (west) elevation with private open space on ground floor to serve the apartment all in a two – storey building. C) On site car and bicycle parking with recessed vehicular entrance onto public road, new screen boundary walls and all associated site development works.
Floor area stated for this source: 142 m².
Source unit value with scope not stated: 2 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.