Site start

Site start — Dublin

Dublin 2, Dublin

1 commencement notice · start date 17 Apr 2023 · planning reference given

Planning WEB5216/21 · Planning application

View full project timeline

Commencement notices
1
Latest start date
17 Apr 2023
Latest notice
54 m²
Planning reference
WEB5216/21
Location
Dublin 2, Dublin

Location

Where the site is

Area
Dublin 2, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The works will consist of the installation of a new AHU, ductwork, and louvre screen to the roof top to 10 Molesworth Street, to include all ancillary works and services. We also confirm that there is no increase in floor space, there is no sub–division of tenancies proposed and there is no requirement for a Fire Safety Certificate.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 54 m².

Planning reference WEB5216/21 Developer stated: Malone Engineering Group

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.