Site start
Housing site start — Tralee
Tralee, Kerry
11 commencement notices · latest start date 30 Jan 2026 · planning reference given
Planning 2360150 · Planning application · Council file · external
- Commencement notices
- 11
- Latest start date
- 30 Jan 2026
- Latest notice
- 424 m²
- Planning reference
- 23/60150
- Location
- Tralee, Kerry
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 2
- Completion certificates
- 0
- Open exact official planning record: 23/60150 Kerry County Council · checked 2026-07-29T15:41:08+00:00
Planning 23/60150 — CONDITIONAL · Decision 2023-11-01 · Final grant 2023-12-05
Exact appeal 318571 · Invalid · 2023-12-29 · Open official case
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Reviewed planning, commencement and document evidence
- Commencement identities
- 11 retained separately
- Latest group date
- 30 Jan 2026 not assigned across events
- Maximum on one notice
- 129 units never summed
- Reviewed index
- 9 9 exact document links
Planning and appeal references
- Planning 23/60150 Open exact official record
Every retained commencement event
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
- Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
Exact organisation roles
- Kerry County CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
Official document index highlights
Reviewed public index extract; this is not asserted to be the complete authority file.
- Architecture drawings 23824-MWP-00-00-DR-C-2103_PROPOSED DRAINAGE SECTIONS Open exact official document
- Architecture drawings 23824-MWP-ZZ-DR-C-1207-S2-P01_ACCESS ROAD C SECTION 2 of 2 Open exact official document
- Site layout 5. 2301 FMP Diag2 Masterplan 10Aug2023 Open exact official document
- Site layout 4. 2301 FMP Diagram 1 Masterplan 10Aug2023 Open exact official document
- Phasing plan 9. 2301 Phasing Diagram 11Aug2023 Open exact official document
- Engineering and drainage 23824-MWP-00-00-DR-C-2102_PROPOSED FOUL DRAINAGE LAYOUT Open exact official document
- Engineering and drainage 23824-MWP-00-00-DR-C-2101_PROPOSED STORM DRAINAGE LAYOUT Open exact official document
- Landscape plans 14. Cloonmore Tree Survey Plan - Rev_02 Open exact official document
- Landscape plans 13. Cloonmore Arbor IA 2023 (003) Open exact official document
Location
Where the site is
- Area
- Tralee, Kerry
- County
- Kerry
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official drawings and scanned-file sources are available below.
Verified official drawing destinations are available for this planning reference.
Use the official drawings or scanned files to review the submitted plans and elevations.
-
Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 23/60150. Kerry County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.Open official scanned files · external
-
Architecture Drawings 23824-MWP-00-00-DR-C-0104-S2-P01_SITE ENTRANCE Exact official drawing for 23/60150. Kerry County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Architecture Drawings 23824-MWP-00-00-DR-C-2103_PROPOSED DRAINAGE SECTIONS Exact official drawing for 23/60150. Kerry County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Official planning file Kerry County Council planning record Application details, status and decision record for 23/60150. Kerry County Council Official link · last checked 29 Jul 2026 Exact official source shared from the planning and approval record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of 4no. two-storey, three- bedroom detached townhouses at [Courtyard units 7,8,20,21] Cloonmore, Tralee, Co. Kerry. Standard methods of construction (Non MMC) will apply
Floor area stated for this source: 424 m².
Source unit value with scope not stated: 129 units. It is not presented as notice-specific scale.
Construction of 4no. two storey, two bedroom attached townhouses at [Block D] Cloonmore, Tralee, Co. Kerry. Standard methods of construction (Non MMC) will apply.
Floor area stated for this source: 375 m².
Source unit value with scope not stated: 129 units. It is not presented as notice-specific scale.
Construction of 4no. two storey, two bedroom attached townhouses at [Block E] Cloonmore, Tralee, Co. Kerry. Standard methods of construction (Non MMC) will apply.
Floor area stated for this source: 375 m².
Source unit value with scope not stated: 129 units. It is not presented as notice-specific scale.
Construction of 3no. two storey, two bedroom attached townhouses at [Block C] Cloonmore, Tralee, Co. Kerry. Standard methods of construction (Non MMC) will apply.
Floor area stated for this source: 281 m².
Source unit value with scope not stated: 129 units. It is not presented as notice-specific scale.
Construction of 3no. two storey, two bedroom attached townhouses at [Block B] Cloonmore, Tralee, Co. Kerry. Standard methods of construction (Non MMC) will apply.
Floor area stated for this source: 281 m².
Source unit value with scope not stated: 129 units. It is not presented as notice-specific scale.
Construction of 1no. five storey building consisting of 66no. one and two bedroom apartments with ground floor childcare facilities and lounge area at [Block F] Cloonmore, Tralee, Co. Kerry. Modern Methods of Construction (MMC) will apply.
Floor area stated for this source: 6,131 m².
Construction of 1no. three storey apartment building consisting of 15no. one and two bedroom apartments at [Block A] Cloonmore, Tralee, Co. Kerry. Modern Methods of Construction (MMC) will apply.
Floor area stated for this source: 1,246 m².
Construction of 1no. three storey apartment building consisting of two apartment blocks with 12no. one and two bedroom apartments at [Block E] Cloonmore, Tralee, Co. Kerry. Modern Methods of Construction (MMC) will apply. Refer for attached townhouses between the two blocks.
Floor area stated for this source: 824 m².
Construction of 1no. three storey apartment building consisting of two apartment blocks with 12no. one and two bedroom apartments at [Block D] Cloonmore, Tralee, Co. Kerry. Modern Methods of Construction (MMC) will apply. Refer for attached townhouses between the two blocks.
Floor area stated for this source: 824 m².
Construction of 1no. three storey apartment building consisting of two apartment blocks with 12no. one and two bedroom apartments at [Block C] Cloonmore, Tralee, Co. Kerry. Modern Methods of Construction (MMC) will apply. Refer for attached townhouses between the two blocks.
Floor area stated for this source: 824 m².
Construction of 1no. three storey apartment building consisting of two apartment blocks with 12no. one and two bedroom apartments at [Block B] Cloonmore, Tralee, Co. Kerry. Modern Methods of Construction (MMC) will apply. Refer for attached townhouses between the two blocks.
Floor area stated for this source: 824 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.