Site start
Building extension site start — Malahide
Malahide, Dublin
1 commencement notice · start date 07 Dec 2018 · planning references given
Planning F18A/0379 + F17A/0760
- Commencement notices
- 1
- Latest start date
- 07 Dec 2018
- Latest notice
- Scale not stated
- Planning references
- F17A/0760 · F18A/0379
- Location
- Malahide, Dublin
Location
Where the site is
- Area
- Malahide, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
F18A/0379 & F17A/0760 - Alterations and extensions comprising two storey extension to side, single and two storey extension to rere with bay window, new porch to front elevation, alterations to front elevation including external insulation, internal alterations, widening of existing vehicular entrance and associated site and ancillary works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.