Site start
Building extension site start — Dublin
Dublin
1 commencement notice · start date 11 Aug 2023 · planning reference given
Planning 4349/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 11 Aug 2023
- Latest notice
- 108 m²
- Planning reference
- 4349/22
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of : (1) the extension and alteration to the existing single storey south side return, (2) the provision of a new eternal west facing garden veranda, (3) replacement of existing non original windows and doors, (4) general internal alterations and repairs, (5) the provision of two new rooflights, (6) treatment and repair of facade finishes.
Floor area stated for this source: 108 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.