Commencement notice group

Building extension commencement notices — Durrow

Durrow, Offaly

1 unique commencement event · latest notified commencement 18 Oct 2018 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
18 Oct 2018
Latest notice
179 m²
Planning references supplied
18/127
Public location
Durrow, Offaly

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
1
  1. Completion certificate recorded — source scope not stated Offaly County Council · commencement CN0045175OY Certificate CC00000021416OY · First observed in the official monthly source 2018-10 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Durrow, Offaly
County
Offaly
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Offaly County Council planning record Application details, status and decision record for 18/127. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0045175OY BCMS owner-supplied export

Replacement of existing roof structure and fabric to the entire building. Replacement of two number flat roof structures with cut timber pitched roofs. Provision of small extension to existing ticket hall. Provision of new internal and external finishes to match existing. Formation of new internal opening connecting hall with existing class room.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 179 m².

Planning reference 18/127 Builder stated: Brookcove Developments Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.