Former Dunally School" (protected Structu — commencement notices
DOONALLY, Sligo
1 unique commencement event · latest notified commencement 24 Jul 2018 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 24 Jul 2018
- Latest notice
- 238 m²
- Planning references supplied
- None stated
- Public location
- DOONALLY, Sligo
Planning-anchored public geography
Site identity and location
- Canonical public locality
- DOONALLY, Sligo
- County
- Sligo
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Sligo County Council planning record Application details, status and decision record for 17456. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
PP - for development consisting of (1) demolition of existing external shelter and flat roof kitchen/utility to rear of existing building; (2) carrying out of change of use to existing building from day care centre to democratic school (total relevant floor area = 235.18 sq.m) - consisting of 3 no multi-purpose rooms, kitchen, library, lobby, general hall with ancillary corridors/stairwell and associated sanitary, office/storage accommodation; (3) carrying out of essential repairs, internal alterations and associated elevational changes to existing building; (4) construct new vehicular entrance, exit, car park and drop off area to the western side of the site; (5) replacing existing septic tank system with a proprietary tertiary effluent treatment system and polishing filter (previous planning permission PL13/327 refers); (6) carrying out all associated ancillary site works to include provision of services landscaping and boundary treatment at "Former Dunally School" (protected Structure RPS No. 289 under Sligo and Environs Development Plan)
Floor area stated for this source: 238 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.