Commencement notice group
Housing commencement notices — Rathmines
Rathmines, Dublin
1 unique commencement event · latest notified commencement 11 Sep 2019 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 11 Sep 2019
- Latest notice
- 1 house
- Planning references supplied
- None stated
- Public location
- Rathmines, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Rathmines, Dublin
- County
- Dublin
Notice location variants
- half landing CN0056475DC
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Protected Structure Change of use from four bedroom bedsit units to a single two-storey family dwelling to include the following works, Removal of side lean-to shed abutting the neighbouring boundary; Demolition of a rear return lean-to bathroom, the construction of a new single storey extension to the north side; Modifications of openings in the rear return side; A new roof to the side single storey rear return; a hidden roof light to the a hidden roof light to the main roof and rear return; Internal alterations;A new door opening in the north elevation;Enlargement of the existing bathroom; Widening of the existing opening at half landing;A new door opening in the North elevation at ground floor level;A new double door opening, from rear reception to rear return; Widening of existing opening at hall to rear return; Insertion of cloakroom and WC under the hall stairs; The removal of internal walls to rear return;The forming of an internal light well in the rear return; The general refurbishment; The renewal of building services; External landscape works and general renovations and necessary ancillary requirements.
Floor area stated for this source: 188 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.