Site start
Housing site start — Rathmines
Rathmines, Dublin
1 commencement notice · start date 11 Sep 2019 · planning reference given
Planning 3847/18
- Commencement notices
- 1
- Latest start date
- 11 Sep 2019
- Latest notice
- 1 house
- Planning reference
- 3847/18
- Location
- Rathmines, Dublin
Location
Where the site is
- Area
- Rathmines, Dublin
- County
- Dublin
Addresses on the notices
- half landing
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Protected Structure Change of use from four bedroom bedsit units to a single two-storey family dwelling to include the following works, Removal of side lean-to shed abutting the neighbouring boundary; Demolition of a rear return lean-to bathroom, the construction of a new single storey extension to the north side; Modifications of openings in the rear return side; A new roof to the side single storey rear return; a hidden roof light to the a hidden roof light to the main roof and rear return; Internal alterations;A new door opening in the north elevation;Enlargement of the existing bathroom; Widening of the existing opening at half landing;A new door opening in the North elevation at ground floor level;A new double door opening, from rear reception to rear return; Widening of existing opening at hall to rear return; Insertion of cloakroom and WC under the hall stairs; The removal of internal walls to rear return;The forming of an internal light well in the rear return; The general refurbishment; The renewal of building services; External landscape works and general renovations and necessary ancillary requirements.
Floor area stated for this source: 188 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.