Site start

Site start — Dublin

Dublin 9, Dublin

1 commencement notice · start date 16 May 2019 · planning reference given

Planning 3811/11x1

Commencement notices
1
Latest start date
16 May 2019
Latest notice
3,448 m²
Planning reference
3811/11X1
Location
27 Drumcondra Road Upper, Dublin 9

Location

Where the site is

Area
Dublin 9, Dublin
County
Dublin

Addresses on the notices

  • 27 Drumcondra Road Upper, Dublin 9
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

7-Day Notice - Demolition of garage and creche, construction of a mixed-use development including fully certified Lidl foodstore & off-licence; shell & core restaurant, coffee bar and offices along with associated works, parking and ancillary services at 25/27 Drumcondra Road Upper, Dublin 9.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,448 m².

Planning reference 3811/11X1

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.