Site start
Coola Post Primary School — site start
Riverstown, Sligo
2 commencement notices · latest start date 27 Sep 2019 · planning reference given
Planning PL18/71
- Commencement notices
- 2
- Latest start date
- 27 Sep 2019
- Latest notice
- 762 m²
- Planning reference
- PL18/71
- Location
- Riverstown, Sligo
Location
Where the site is
- Area
- Riverstown, Sligo
- County
- Sligo
Addresses on the notices
- Coola, Sligo
- Coola Post Primary School
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a single story extension 757m2 together with all associated site works and services at Coola Post Primary School
Floor area stated for this source: 762 m².
Relocate 2 no. existing prefabricated buildings; Erect 4 no. temporary prefabricated buildings for the duration of construction of the extension
Floor area stated for this source: 2,092 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.