Site start
Housing site start — Kilcullen
Kilcullen, Kildare
2 commencement notices · latest start date 03 Jun 2022 · planning reference given
Planning 19824 & ABP-307416-20
- Commencement notices
- 2
- Latest start date
- 03 Jun 2022
- Latest notice
- 6 houses
- Planning reference
- ABP-307416-20
- Location
- Kilcullen, Kildare
Location
Where the site is
- Area
- Kilcullen, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-307416-20. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 8(House No 45,46,47,48,49 & 50) of the overall development of (a) 54 No. new semi-detached dwellings comprising 27 No. three bedroom two storey dwellings Type A1, 1 No. three bedroom two storey dwelling Type A2, 9 No. four bedroom dormer dwellings Type B1, 1 No. four bedroom dormer dwelling Type B2, 10 No. three bedroom dormer dwellings Type C1, 3 No. two bedroom bungalow dwellings Type D1 and 3 No. two bedroom bungalow dwellings Type D2. (b) Two new vehicular and pedestrian access points connecting into an existing roads network within the existing adjoining housing development and also new pedestrian entrance onto the R448 Naas Road. (c) All associated site development and facilitation works to include temporary construction vehicle entrance and access road along existing agricultural access, civil engineering cut and fill works to achieve levels proposed, roads, paths, car parking, drainage and sewerage networks, watermain, electrical and telecommunications service connections, boundary treatments, landscaping works
Floor area stated for this source: 926 m².
Phase 7(House No 33,34,35,36,37,38,39 & 40) of the overall development of (a) 54 No. new semi-detached dwellings comprising 27 No. three bedroom two storey dwellings Type A1, 1 No. three bedroom two storey dwelling Type A2, 9 No. four bedroom dormer dwellings Type B1, 1 No. four bedroom dormer dwelling Type B2, 10 No. three bedroom dormer dwellings Type C1, 3 No. two bedroom bungalow dwellings Type D1 and 3 No. two bedroom bungalow dwellings Type D2. (b) Two new vehicular and pedestrian access points connecting into an existing roads network within the existing adjoining housing development and also new pedestrian entrance onto the R448 Naas Road. (c) All associated site development and facilitation works to include temporary construction vehicle entrance and access road along existing agricultural access, civil engineering cut and fill works to achieve levels proposed, roads, paths, car parking, drainage and sewerage networks, watermain, electrical and telecommunications service connections, boundary treatments, landscaping works
Floor area stated for this source: 912 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.