Site start
3054 Lake Drive, Dublin
Dublin
1 commencement notice · start date 10 Dec 2024 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 10 Dec 2024
- Latest notice
- 743 m²
- Planning references
- None given
- Location
- 3054 Lake Drive, Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- 3054 Lake Drive, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The project involves a new Cat B fit-out of an existing Cat B ground floor (part) commercial office fit- out. The scope of work encompasses internal demotion and fit out only. This will include alterations of existing M&E systems and supplementary installation to service new layout. The building located at 3054 Lake Dr, Citywest Business Campus, Dublin 24, D24 HN204.
Floor area stated for this source: 743 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.