Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 10 Nov 2023 · planning reference given
Planning 3953/23 · Planning application
- Commencement notices
- 1
- Latest start date
- 10 Nov 2023
- Latest notice
- 572 m²
- Planning reference
- 3953/23
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- ground, first and attic levels to accommodate a 5-no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposal provides for the extension and reconfiguration of the existing property at ground, first and attic levels to accommodate a 5-no. bedroom semidetached dwelling, as follows: (i) the extension along the rear at ground floor level (112sqm) to accommodate a living room with 2 no. external stores to the west, dining room, kitchen, and 3 no. roof lights.
Floor area stated for this source: 572 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.