Commencement notice group
Collinstown Industrial Park — commencement notices
Leixlip, Kildare
6 unique commencement events · latest notified commencement 03 Nov 2020 · planning reference supplied
- Unique commencement events
- 6
- Latest notified commencement
- 03 Nov 2020
- Latest notice
- 30 m²
- Planning references supplied
- 19/1339
- Public location
- Leixlip, Kildare
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 5
- Open exact official planning record: 19/1339 Kildare County Council
- Completion certificate recorded — source scope not stated Kildare County Council · commencement SN0005345KE Certificate CC00000046355KE · First observed in the official monthly source 2020-06 1 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Kildare County Council · commencement CN0064757KE Certificate CC00000046362KE · First observed in the official monthly source 2020-06 1 units stated for this certificate · One certificate representation
- Partial completion certificate recorded Kildare County Council · commencement CN0064757KE Certificate CC00000050624KE · First observed in the official monthly source 2020-06 1 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Kildare County Council · commencement SN0005344KE Certificate CC00000050639KE · First observed in the official monthly source 2020-06 1 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Kildare County Council · commencement SN0005664KE Certificate CC00000050626KE · First observed in the official monthly source 2020-11 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Leixlip, Kildare
- County
- Kildare
Notice location variants
- Intel, Leixlip, Co SN0005664KE, SN0005345KE, SN0005344KE
- Collinstown Industrial Park, Leixlip, Co Kildare CN0064758KE, CN0064757KE
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 19/1339. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Chemical Water Treatment house (Plot 2) at Intel, Leixlip, Co. Kildare.
Floor area stated for this source: 30 m².
Power Distribution Centre (ASU 2 (PDC for the CTPS)), is situated in (Plot 1), is part of an industrial gas facility that provide industrial gasses for intel Ireland's Leixlip in Co Kildare. Its contains a single storey container of electrical power distribution plant building, it is approximately 18.2 m long by 5.2 m wide by 4.2 m high modular building. The Raised off the ground on a supporting steel platform, accessed by a short flight of industrial type external stairway.
Floor area stated for this source: 95 m².
Analyser Building (Plot 3) at Intel, Leixlip, Co. Kildare
Floor area stated for this source: 30 m².
Analyser Building (Plot 1) at Intel, Leixlip, Co. Kildare.
Floor area stated for this source: 30 m².
Construction of Compressor Building (ASU2) at Collinstown Industrial Park, Leixlip, Co Kildare
Floor area stated for this source: 545 m².
Construction of a compressor building (ASU1) at Collinstown Industrial Park, Leixlip, Co Kildare
Floor area stated for this source: 545 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.