Commencement notice group
Collinstown Industrial Park — commencement notices
Leixlip, Kildare
6 separate notices · latest notified commencement 03 Nov 2020 · planning reference supplied
- Source notices
- 6
- Latest notified commencement
- 03 Nov 2020
- Latest notice
- 30 m²
- Planning references supplied
- 19/1339
- Public location
- Leixlip, Kildare
Public source geography
Site location
- Public site / locality
- Leixlip, Kildare
- County
- Kildare
Public site labels seen across the notices
- Intel, Leixlip, Co
- Collinstown Industrial Park, Leixlip, Co Kildare
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Kildare County Council · reference 19/1339 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Chemical Water Treatment house (Plot 2) at Intel, Leixlip, Co. Kildare.
30 m² · stated on this notice
Power Distribution Centre (ASU 2 (PDC for the CTPS)), is situated in (Plot 1), is part of an industrial gas facility that provide industrial gasses for intel Ireland's Leixlip in Co Kildare. Its contains a single storey container of electrical power distribution plant building, it is approximately 18.2 m long by 5.2 m wide by 4.2 m high modular building. The Raised off the ground on a supporting steel platform, accessed by a short flight of industrial type external stairway.
95 m² · stated on this notice
Analyser Building (Plot 3) at Intel, Leixlip, Co. Kildare
30 m² · stated on this notice
Analyser Building (Plot 1) at Intel, Leixlip, Co. Kildare.
30 m² · stated on this notice
Construction of Compressor Building (ASU2) at Collinstown Industrial Park, Leixlip, Co Kildare
545 m² · stated on this notice
Construction of a compressor building (ASU1) at Collinstown Industrial Park, Leixlip, Co Kildare
545 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.