Housing site start — Newtown Forbes

Newtown Forbes, Longford

2 commencement notices · latest start date 20 Jul 2020 · planning references given

Planning 17/297 · Council file · external

View full project timeline

Commencement notices
2
Latest start date
20 Jul 2020
Latest notice
4 houses
Planning references
17/297 · 17297
Location
Newtown Forbes, Longford

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Newtown Forbes, Longford
County
Longford

Addresses on the notices

  • Newtownforbes, Longford
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Longford County Council planning record Application details, status and decision record for 17/297. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

proposed construction of houses 09 & 10 of the 4 No. Four Bedroom Two Storey Semi-Detached Type Dwelling Houses On Site No's 09-12 Inclusive of the same Design that were Previously Granted Full Planning Permission Under Planning Reference Number PL04/714, Proposed Connections Into the Existing Foul Sewer, Surface Water & watermain Networks Serving the existing Housing Estate which was Previously Granted Full Planning Permission under Planning Reference Number PL04/714 and all ancillary works

Work stated for this notice 4 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 251 m².

Planning reference 17/297
Notice 2 Commencement notice

proposed construction of houses 11 & 12 of the 4 No. Four Bedroom Two Storey Semi-Detached Type Dwelling Houses On Site No's 09-12 Inclusive of the same Design that were Previously Granted Full Planning Permission Under Planning Reference Number PL04/714, Proposed Connections Into the Existing Foul Sewer, Surface Water & watermain Networks Serving the existing Housing Estate which was Previously Granted Full Planning Permission under Planning Reference Number PL04/714 and all ancillary works

Work stated for this notice 4 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 251 m².

Planning reference 17297

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.