Site start

Housing site start — Cork City

Cork City, Cork

1 commencement notice · start date 09 Feb 2026 · planning reference given

Planning 25/43968

Commencement notices
1
Latest start date
09 Feb 2026
Latest notice
1 house
Planning reference
25/43968
Location
Cork City, Cork

Location

Where the site is

Area
Cork City, Cork
County
Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Alterations & extensions to existing dwelling including the following works: 1) a part 2-storey, part single storeyside & rear flat roof extension 2) a single storey front porch & bay window extension with a pitched roof 3) an attic rooflight in the front facing main roof 4) all other associated site works

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 179 m².

Planning reference 25/43968

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.