Site start
Building extension site start — Dalkey
Dalkey, Dublin
1 commencement notice · start date 14 Jan 2016 · planning reference given
Planning D15A/0343 · Planning application
- Commencement notices
- 1
- Latest start date
- 14 Jan 2016
- Latest notice
- Scale not stated
- Planning reference
- D15A/0343
- Location
- Dalkey, Dublin
Location
Where the site is
- Area
- Dalkey, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of new two storey extension to the rear (35 sqm), new roof with clerestory windows over new extension and return, internal alterations including replacing existing non original tile floors, removal of non-original partitions, making new bathrooms at ground and first floor level, formation of new roof light above staircase, enlargement of existing openings to the return, formation on new window opening to first floor side elevation, general repair and refurbishment of the existing house (253 sqm) including repairs as required to the windows, facades and roof, demolition of existing non-original single storey garage, associated conservation works, site works and ancillary works including new vehicular access gates to the front.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.