Site start
Housing site start — Swords
Swords, Dublin
1 commencement notice · start date 12 Oct 2020 · planning reference given
Planning F19A/0347 · Planning application
- Commencement notices
- 1
- Latest start date
- 12 Oct 2020
- Latest notice
- 190 m²
- Planning reference
- F19A/0347
- Location
- Swords, Dublin
Location
Where the site is
- Area
- Swords, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will comprise of the following: (i) Construction of a single storey, three- bedroom detached dwelling; (ii) Installation of a new proprietary wastewater treatment system, percolation area and all associated site works. (iii) Alterations to the existing boundary treatment onto the public road. (iv) Construction of a new vehicular entrance onto Balcultry Road (v) Boundary treatment, landscaping and all ancillary works necessary to facilitate the development.
Floor area stated for this source: 190 m².
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.