Site start
Housing site start — Dublin
Dublin 1, Dublin
4 commencement notices · latest start date 02 Mar 2020 · planning reference given
Planning DSDZ2464/19 · Planning application
- Commencement notices
- 4
- Latest start date
- 02 Mar 2020
- Latest notice
- 117 units
- Planning reference
- DSDZ2464/19
- Location
- Dublin 1, Dublin
Location
Where the site is
- Area
- Dublin 1, Dublin
- County
- Dublin
Addresses on the notices
- Dublin Docklands Note: The works above Level 5 will be subject of a separate Commencement Notice
- Dublin Docklands
- the Dublin Docklands
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Blocks 3DE and 3E2 – Construction works from Ground Floor to level 5. The works involve permanent piling, concrete works, associated underground works and Fit Out works to facilitate a Residential Development forming part of Coopers Cross development at Dublin Docklands Note: The works above Level 5 will be subject of a separate Commencement Notice.
Floor area stated for this source: 9,484 m².
Blocks 3A1/3A2 and B – Construction works from Basement to level 5. The works involve permanent piling, concrete works, associated underground works and Fit Out works to facilitate a Residential Development forming part of Coopers Cross development at Dublin Docklands.” Note: The above ground works and Fit Out of the Basement will be subject of a separate Commencement Notice.
Floor area stated for this source: 28,144 m².
Residential Development forming part of Coopers Cross Residential development at the Dublin Docklands. The works involve a contiguous piled wall (associated with Blocks 3A1/3A2 and B), a bulk dig and the installation of a retaining wall (associated with the Mews Houses) and works to the existing below ground services as may be required to facilitate the enabling works on site at 165-182 Sheri? St Upper, Dublin 1.
Proposed Residential Development forming part of City Block 3 development at Dublin Docklands. These works consist of demolition & site clearance dig at 165-182 Sheriff St Upper, Dublin 1
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.