Site start
Building extension site start — Rathmines
Rathmines, Dublin
1 commencement notice · start date 03 Jan 2018 · planning reference given
Planning 2642/17
- Commencement notices
- 1
- Latest start date
- 03 Jan 2018
- Latest notice
- Scale not stated
- Planning reference
- 2642/17
- Location
- Rathmines, Dublin
Location
Where the site is
- Area
- Rathmines, Dublin
- County
- Dublin
Addresses on the notices
- drawing room to rear garden, plus widen supported opening in main rear-wall over kitchen-dining, plus remove 1 no
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development to consist of; demolition of rear single-storey modern kitchen extension (Circa 12.5 m²), removal of roof of, and making of new door-opening in, side extension, plus relocation of kitchen hearth, and removal of double doors, frame and overpanel at drawing room to rear garden, plus widen supported opening in main rear-wall over kitchen-dining, plus remove 1 no. hot-press, 2 no. bathrooms and 1 No dressing room, plus provide new single-storey kitchen extension (Circa 22m²), new side-door, and roof to, side extension, plus repoint external brickwork in lime-mortar and clean brickwork and stonework, plus repair and make good existing rainwater goods, plus provide insulation to inner face of external and part of adjacent walls throughout hall and main reception level, plus reinstate sliding-sash window with double-doors below within existing opening at drawing room to rear garden, plus open-up, investigate, define, report on and carry-out remedial structural and asssociate works to compromised bowed timber floors at half-level 5, plus provide new utility room, plus new bedroom, plus relocate one bathroom and remake one bathroom as shower room plus provide one new shower room in place of bedroom, plus refit downstairs lavatory and cloaks, plus retain and service 5 no. existing sliding-sash period window frames and casements in rear wall and 3 no. in side wall and provide slimlite double-glazing and draft proofing, plus draftproof and insulate under main reception floor throughout, plus provide new sandwich insulated floor with underfloor heating to kitchen dining, plus reinstate hearth surround and stove plus carry out remedial works to the roof plus all associated works including temporary works, painting and decoration, electrical, plumbing and associated drainage and including adjustments to hard and soft landscaping.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.