Commencement notice group
Commencement notices — Togher
Togher, Cork
1 unique commencement event · latest notified commencement 28 May 2026 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 28 May 2026
- Latest notice
- 1,747 m²
- Planning references supplied
- 25/44151
- Public location
- Togher, Cork
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Togher, Cork
- County
- Cork
Notice location variants
- roof level CN0142906CY
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Development which will consist of change of use of unit from distribution /storage use (as permitted under Reg. ref. 19/38772) to use as an Uisce Eireann Operations Centre; associated internal layout changes including the provision of 271 sq.m of new first floor space; minor elevational changes; provision of 2 no. AOVs at roof level; and new exterior signage (total floor area of revised Unit 7 1,747 sq.m). Permission is also sought for development comprising further external yard layout and internal road works (incorporating revisions to the yard extent and layout previously permitted under Reg. Ref. 19/38772) consisting of: extension of yard area to southern side of building to provide materials storage area, a miscellaneous components storage area, a washdown area and a secured fleet vehicle holding area; reconfiguration of hardstand, vehicular circulation, pedestrian circulation and landscaping areas around Unit 7; increase parking spaces from 9 no. as permitted to 11 no; perimeter security fencing and vehicular gate; internal fencing and associated vehicular gates; provision of bin enclosure; external plant (air conditioning unit, a heat pump and 2 no. condenser units all on a concrete plinth enclosed by fence); provision of cycle parking; site lighting; and all associated site development and landscaping works. at: Unit 7, Westgate Business Park, Lehenaghmore Togher, Cork
Floor area stated for this source: 1,747 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.