Site start
Site start — Dublin
Dublin 7, Dublin
1 commencement notice · start date 28 Jan 2019 · planning reference given
Planning 3341/18
- Commencement notices
- 1
- Latest start date
- 28 Jan 2019
- Latest notice
- 5,272 m²
- Planning reference
- 3341/18
- Location
- Dublin 7, Dublin
Location
Where the site is
- Area
- Dublin 7, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposed development consists of the upgrading and modification to part of the first floor of the existing building known as the Presidents Suite. The proposed works involves the upgrade and modification to the existing layout and finished floor level in compliance with Part B of the building regulations. Externally this upgrade will include modification to the existing windows, flat roof and an addition of guarding and fire escape stairs behind the south quadrant wall.
Floor area stated for this source: 5,272 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.