Commencement notice group

Housing commencement notices — Gorey

Gorey, Wexford

2 separate notices · latest notified commencement 07 May 2026 · planning reference supplied

Source notices
2
Latest notified commencement
07 May 2026
Latest notice
1 home
Planning references supplied
20221614
Public location
Gorey, Wexford

Public source geography

Site location

Public site / locality
Gorey, Wexford
County
Wexford

Public site labels seen across the notices

  • Glandoran, Wexford
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning reference20221614

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0141943WX BCMS owner-supplied export

proposed single storey dwelling

1 home · 223 m² · stated on this notice

Planning reference 20221614 Builder stated: Molloy Architecture Ltd Developer stated: Molloy Architecture Ltd
CN0115110WX BCMS owner-supplied export

Construction of a new dwelling with first floor mezzanine

1 home · 256 m² · stated on this notice

Planning reference 20221614

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.