Site start

Building extension site start — Glenageary

Glenageary, Dublin

1 commencement notice · start date 15 Mar 2018 · planning reference given

Planning D17B/0473 · Planning application

View full project timeline

Commencement notices
1
Latest start date
15 Mar 2018
Latest notice
1 unit
Planning reference
D17B/0473
Location
Glenageary, Dublin

Location

Where the site is

Area
Glenageary, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

a) Demolition of existing 12.5m2 conservatory to rear associated internal modifications and site works b) Proposed single storey flat roof extension to side and single storey monopitch extension to rear providing an additional 28m2 to ground floor c) Associated internal modifications and site works.

Work stated for this notice 1 unit Explicit phase quantity stated by the source.
Planning reference D17B/0473

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.