Site start
Housing site start — Blackrock
Blackrock, Dublin
1 commencement notice · start date 09 Jun 2025 · planning reference given
Planning D24B/0519/WEB · Planning application
- Commencement notices
- 1
- Latest start date
- 09 Jun 2025
- Latest notice
- Scale not stated
- Planning reference
- D24B/0519/WEB
- Location
- Blackrock, Dublin
Location
Where the site is
- Area
- Blackrock, Dublin
- County
- Dublin
Addresses on the notices
- front door, proposed rooflights and all associated site works
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
the demolition of front garage wall and rear single storey extension (totalling approx. 10sqm), the construction of ground floor extension to front, the construction of first floor extension with pitched roof to side and the construction of ground floor single storey flat roof extension to rear (totalling approx. 58sqm). The development will also include externally insulating the retained house (render and brick slip finish), alterations to hipped roof, alterations to internal layouts, changes to selected existing window opes, proposed canopy at front door, proposed rooflights and all associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.