Site start

Housing site start — Goleen

Goleen, Cork

1 commencement notice · start date 11 Aug 2018 · planning reference given

Planning 13/296 · Planning application

Commencement notices
1
Latest start date
11 Aug 2018
Latest notice
170 m²
Planning reference
13/00296
Location
Goleen, Cork

Location

Where the site is

Area
Goleen, Cork
County
Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of a split-level, earth sheltered dwelling house, with waste water treatment and percolation area, vehicular entrance and all associated site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 170 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 13/00296 Developer stated: OS Insulate Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.