Site start
76 Botanic Road, Glasnevin
Glasnevin, Dublin
1 commencement notice · start date 06 Feb 2020 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 06 Feb 2020
- Latest notice
- 155 m²
- Planning references
- None given
- Location
- 76 Botanic Road, Glasnevin, Dublin
Location
Where the site is
- Area
- Glasnevin, Dublin
- County
- Dublin
Addresses on the notices
- 76 Botanic Road, Glasnevin, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Refurbishment works to the existing two-storey, end of terrace building, used as ancillary accommodation to the existing adjacent Hotel with shared access and facilities (Sunnybanks Hotel – located next door, South of the proposed development), at No. 76 Botanic Road, Glasnevin, Co. Dublin
Floor area stated for this source: 155 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.