Site start

Site start — Dublin

Dublin 18, Dublin

1 commencement notice · start date 04 Aug 2026 · planning reference given

Planning D25A/0616/WEB · Planning application

View full project timeline

Commencement notices
1
Latest start date
04 Aug 2026
Latest notice
515 m²
Planning reference
D25A/0616/WEB
Location
Dublin 18, Dublin

Location

Where the site is

Area
Dublin 18, Dublin
County
Dublin

Addresses on the notices

  • Unit RW C08, Block C1 Beacon South Quarter, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Material Alterations and Change from the former use of this premises as a branch bank to use as a children's indoor play zone with a mezzanine floor at Unit RW C08, Block C1 Beacon South Quarter, Co. Dublin.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 515 m².

Planning reference D25A/0616/WEB Developer stated: Sandyford Leisure Centre Limited

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.