Commencement notice group
Housing commencement notices — Celbridge
Kildare, Kildare
2 separate notices · latest notified commencement 30 Dec 2022 · planning reference supplied
- Source notices
- 2
- Latest notified commencement
- 30 Dec 2022
- Latest notice
- 1 unit
- Planning references supplied
- 19/260
- Public location
- Kildare, Kildare
Public source geography
Site location
- Public site / locality
- Kildare, Kildare
- County
- Kildare
Public site labels seen across the notices
- Celbridge, Kildare
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Kildare County Council · reference 19260 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of bay window to front, front porch, conversion of attic space to accomodation, dormer windows to front. all new electrical, heating plumbing, insulation
1 unit · 178 m² · stated on this notice
The demolition of existing sub standard timber sunroom extension to rear and for the erection of a new two storey bedroom and bathroom extension to side over garage, and single storey living room and utility room extension to rear of house with all associated site and drainage works
1 home · 101 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.