Housing site start — Cratloe

Cratloe, Clare

1 commencement notice · start date 13 Apr 2026 · planning reference given

Planning P21/414

Commencement notices
1
Latest start date
13 Apr 2026
Latest notice
217 m²
Planning reference
P21/414
Location
Cratloe, Clare

Location

Where the site is

Area
Cratloe, Clare
County
Clare

Addresses on the notices

  • Ballintlea South, Cratloe, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Planning permission to construct a new dwelling house, site entrance and on-site wastewater treatment system along with all other associated site works at Ballintlea South, Cratloe, Co. Clare.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 217 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference P21/414

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.