Site start
Building extension site start — Ballsbridge
Ballsbridge, Dublin
1 commencement notice · start date 11 Oct 2016 · planning reference given
Planning 3225/16
- Commencement notices
- 1
- Latest start date
- 11 Oct 2016
- Latest notice
- Scale not stated
- Planning reference
- 3225/16
- Location
- Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the cleaning and repair of the external stonework and the stained glass windows of St. Bartholomew’s Church, a protected structure, including the North Wall of Nave, The West Wall of Nave, the Vestry, the entire Tower, the renovation of the existing tower roof, the repair of the existing perimeter historic railings, a general mechanical and electrical upgrade of the Church, the re-arrangement of some of the timber pews and the provision of new loose furniture, the repair of the nave plaster, the repair and cleaning of the Chancel decorative scheme and the touch up repair and cleaning of the Nave and Transepts decorative scheme.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.