Site start

Commercial site start — Shannon Industrial Estate

Shannon Industrial Estate, Clare

1 commencement notice · start date 09 May 2019 · planning reference given

Planning P15/121

Commencement notices
1
Latest start date
09 May 2019
Latest notice
432 m²
Planning reference
P15/121
Location
Shannon Industrial Estate, Clare

Location

Where the site is

Area
Shannon Industrial Estate, Clare
County
Clare

Addresses on the notices

  • Hangar 5, Shannon Airport, Shannon, Co
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Construction of new 432m2 Modular Office at Hangar 5, Shannon Airport, Shannon, Co. Clare including extension to existing carpark, drainage and service infrastructure, concrete hardstand and all associated works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 432 m².

Planning reference P15/121

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.