Site start
Housing site start — Glengarriff
Glengarriff, Cork
1 commencement notice · start date 08 May 2024 · planning reference given
Planning 23/564 · Planning application
- Commencement notices
- 1
- Latest start date
- 08 May 2024
- Latest notice
- Scale not stated
- Planning reference
- 23/00564
- Location
- Glengarriff, Cork
Location
Where the site is
- Area
- Glengarriff, Cork
- County
- Cork
Addresses on the notices
- roof level, c) the provision of 5 no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
alterations to the existing dwelling house to include a) the demolition of existing porch, b) the construction of a new conservatory extension and external balcony with PV panels at roof level, c) the provision of 5 no. new rooflights; d) internal modifications to the existing dwelling house including proposed new kitchen and ensuite bedroom at ground floor level and 2 no. ensuites to existing bedrooms and WC to replace existing bedroom at first floor level; e) decommissioning of existing septic tank and the construction of a new wastewater treatment unit; and f) all ancillary development works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.