Commencement notice group
Building extension commencement notices — Rathfarnham
Rathfarnham, Dublin
1 unique commencement event · latest notified commencement 12 Jan 2026 · planning basis not stated
- Unique commencement events
- 1
- Latest notified commencement
- 12 Jan 2026
- Latest notice
- 6 m²
- Planning references supplied
- None stated
- Public location
- Rathfarnham, Dublin
Public source geography
Site location
- Public site / locality
- Rathfarnham, Dublin
- County
- Dublin
Public site labels seen across the notices
- ground floor to front and rear
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD25B/0012W. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
• Demolition of existing single storey extension / garage to side and rear; • Construction of a single storey extension to the front and side including rooflight and covered areas to front; • Alterations to existing windows / doors and/or new openings at ground floor to front and rear; • Widening of the front existing vehicular entrance to 3.5m and associated alterations to plinth, railings and gates; • All associated demolition, internal layout alterations, associated site, landscaping and drainage works.
Floor area stated for this source: 6 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.