Site start
Housing site start — Sandymount
Sandymount, Dublin
1 commencement notice · start date 03 Jul 2017 · planning reference given
Planning 4250/16
- Commencement notices
- 1
- Latest start date
- 03 Jul 2017
- Latest notice
- Scale not stated
- Planning reference
- 4250/16
- Location
- Sandymount, Dublin
Location
Where the site is
- Area
- Sandymount, Dublin
- County
- Dublin
Addresses on the notices
- first floor level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
a)The change of use from 10 no bedsit apartments to one single dwelling. b)The demolition of the existing single-storey extension and associated outhouses to the rear of the property. c)The partial demolition of the existing three storey return and the construction of a replacement three storey return and extension to the rear of the property along with all associated fenestration and architectural elements. d)The provision of a new window to the rear elevation at first floor level. e)The provision of additional windows to the side elevation of the existing house and return at basement, ground and first floor levels. f)All associated internal structural and associated works to the existing house on all levels, roof-lights and site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.