Site start

Housing site start — Glin

Glin, Limerick

2 commencement notices · latest start date 24 Apr 2024 · planning reference given

Planning 211829 · Planning application · Council file · external

View full project timeline

Commencement notices
2
Latest start date
24 Apr 2024
Latest notice
250 m²
Planning reference
211829
Location
Glin, Limerick

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Glin, Limerick
County
Limerick
Location evidence needs care
  • Notice source points are up to 2.0 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 52.569135, -9.251616 Open point
  • Public notice source · 52.568892, -9.281907 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Limerick City and County Council planning record Application details, status and decision record for 211829. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

construction of a dwelling house, new entrance and entrance walls, the installation of a mechanical aeration unit with polishing filter system with all associated site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 250 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 211829
Notice 2 Commencement notice (owner-supplied)

Construction a domestic garage with all associated works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 40 m².

Planning reference 211829

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.