Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 08 Sep 2026 · planning reference given
Planning D26A/0162/WEB · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 08 Sep 2026
- Latest notice
- 1 house
- Planning reference
- D26A/0162/WEB
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of demolitions & modifications to the existing detached single-storey dwelling and the construction of a new 39sqm single-storey extension to the rear (Planning Exempted Development). Modifications to the existing dwelling include: Removal of the existing side/front Garage; Removal of the existing side/rear Utility/WC & Shed; Removal of the existing Rear Conservatory/Sun Room; Removal of rear chimney; New Window/Door Openings and Modifications to Existing Window/Door Openings; Modification & Widening of Existing Vehicular Entrance. All along with associated site works & services.
Floor area stated for this source: 181 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.